The Parkside Gritting Plan
PRIORITY ORDER
- The Parkside Junction with N Witham Road
- Footpath from The Parkside to Harrington Way (slope)
- North Witham Road Slope Grit as required to keep route open ( additional to LCC gritting)
- If required can be used for to grit Halford Close and Coverely Road Slopes